CGPR Module Capital Goods Purchase Requisition — UI Wireframe Prepared by Triline Infotech Pvt. Ltd. for Uniparts India Limited Version 1.0  ·  April 2026  ·  Confidential
CGPRDashboard
Wednesday, 16 April 2026
5
My open PRs
3
1 returned — needs revision
Pending my approval
5
1 SLA overdue (>5 days)
PRs this month
12
+3 vs previous month
POs raised
2
₹8.6L total value
Recent requisitions
🔍
📄
PR No.ItemEst. Cost (₹)StageStatus
CGPR/25-26/0041CNC turning centre (4-axis)28,50,000Finance reviewPending
CGPR/25-26/0038Air compressor 50 HP6,80,000RFQ stageIn progress
CGPR/25-26/0035Welding station (6-torch)1,20,000PO issuedComplete
CGPR/25-26/0029Laptops – engineering (4 nos.)2,40,000ReturnedReturned
CGPR/25-26/0021Forklift 3-ton electric14,20,000MD approvalPending
Pending actions
For: Rajesh Kumar (HOD – Production)
CGPR/25-26/0041
CNC turning centre · Day 2 · SLA: 5 days
CS-2025-0089 approval
Air compressor 50 HP · CS sign-off needed
Pipeline overview
Draft
1
Pending approval
5
In procurement
3
PO issued
2
Rejected
1
New Capital Goods Requisition PR No. auto-assigned on submit
Basic Information
Note: Budget availability is not validated by this system. Finance Manager independently verifies budget during the approval stage. This module tracks commitment (PRs and POs raised) for reference only.
Item Details
# Item name / description Category Qty UOM Est. unit cost (₹) Est. total (₹) Make / brand preference
1
2
Total estimated cost (all items)
Attachments (PDF, JPG, PNG, XLSX · max 10 MB each)
Drag & drop files here, or browse to upload
Spec sheets, equipment condition reports, cost analyses
CGPR/25-26/0041
Finance review — pending
₹28,50,000
Suresh Patil · Production · 14-Apr-2026
Items (2 line items)
#Item name / descriptionCategory QtyUOM Make preference Est. unit cost (₹) Est. total (₹)
1
CNC turning centre (4-axis)
Machinery & equipment 1No. BFW LX-40 or equivalent 28,00,000 28,00,000
2
Coolant recirculation unit
Sub-item — required with CNC machine
Machinery & equipment 1Set OEM spec 50,000 50,000
Total estimated cost 28,50,000
Department
Production
Cost centre
CC-PROD-01
Required by
30-Jun-2026
Priority
Urgent
Technical specifications
Swing over bed: 500mm · Between centres: 1000mm · Spindle bore: 82mm · Spindle speed: 2500 rpm · Turret: 12-station BMT55. Preferred: BFW LX-40 or equivalent.
Business justification
Existing BFW LX-20 is 14 years old; OEM support discontinued. New machine needed for crankshaft machining line (240 pcs/day target). Replacement eliminates ₹4.2L/year outsourcing cost.
Attachments (3 files)
📄 Technical_spec_BFW_LX40.pdfDownload
📄 Old_machine_condition_report.pdfDownload
📊 Outsourcing_cost_analysis.xlsxDownload
Approval trail
Suresh Patil
Submitted · 14-Apr-2026, 10:23 am
Rajesh Kumar (HOD)
Approved · 14-Apr-2026, 4:15 pm
"Verified specs with maintenance team. Capacity gap confirmed. Proceed to finance review."
Priya Mehta (Finance Manager)
Pending · assigned 14-Apr-2026, 4:16 pm
V.K. Sharma (Plant Head)
Waiting — triggers after Finance approves
R.S. Agarwal (MD)
Waiting — amount > ₹10,00,000
Discussion Visible to all. Does not trigger any workflow action.
@ Notify person Optional — they will receive an email notification about your comment
Approval decision Acting as: Priya Mehta — Finance Manager
✓ Approve
Routes PR to next approval level
↵ Return
Sends back to requestor; chain resets
✕ Reject PR
Permanently closes PR; cannot undo
@ Also notify
Remarks are logged permanently in the audit trail and emailed to the requestor.
Approval Queue Rajesh Kumar · HOD – Production
5 items pending
3
Awaiting my action
1
SLA overdue (>5 days)
8
Approved this month
🔍
📄
PR No.ItemDeptEst. Cost (₹)RequestorSubmittedDaysAction
CGPR/25-26/0043Press brake 80-tonProduction4,80,000M. Patil15-Apr-261
CGPR/25-26/0041CNC turning centreProduction28,50,000S. Patil14-Apr-262
CGPR/25-26/0039Laptops – engineering (4)IT2,40,000A. Desai12-Apr-264
CGPR/25-26/0036Air compressor 50 HPMaintenance6,80,000R. Joshi09-Apr-267 ⚑Returned
CGPR/25-26/0031Welding stationProduction1,20,000P. Kamble02-Apr-2614Approved
⚑ SLA breach — threshold: 5 working days for HOD level
CGPR/25-26/0036
Air compressor, screw type, 50 HP, 240 CFM
Approved est. ₹6,80,000
Approved by HOD + Finance · 10-Apr-2026
Minimum 3 vendor quotations required before comparative statement can be generated.
ParameterVendor AVendor BVendor C
Vendor name
Quote ref. & date
Quote document
📄 Elgi_Quote_EE1143.pdf ViewRemove
Item-wise pricing
└ Item 1: CNC turning centre
└ Item 2: Coolant recirculation unit
Basic price total (₹)
GST rate (%)
Freight (₹)
Total landed (₹)
Delivery (weeks)
Payment terms
Warranty period
Remarks
Recommend as L1
Purchase officer observations
Brief technical or commercial assessment per vendor — carried into the comparative statement and visible to all approvers.
Vendor A observation
Vendor B observation
Vendor C observation
Comparative Statement CS-2025-0089 · Auto-generated 12-Apr-2026
Awaiting CS approval
PR: CGPR/25-26/0036 · Air compressor 50 HP · Approved est. ₹6,80,000
ParameterVendor A — Elgi EquipmentsVendor B — Atlas CopcoVendor C — Kaeser
RankL1 — RecommendedL2L3 — No quote
Basic price (₹)5,76,2726,12,800
GST 18% (₹)1,03,7291,10,304
Freight (₹)08,500
Total landed (₹)6,80,0017,31,604
Delivery (weeks)6–88–10
Payment terms30% advanceLC at sight
Warranty12 months18 months
Quote document
📄 Elgi_Quote_EE1143.pdf 👁 View
📄 AtlasCopco_Quote_AC8820.pdf 👁 View
No document — quote not received
Savings vs next₹51,603 (7.1%)
Purchase officer observations
Assessment submitted by Anil Joshi (Purchase Officer) · 12-Apr-2026
Vendor A — Elgi Equipments  L1
Technically fully compliant. Lowest landed cost. Delivery of 6–8 weeks is acceptable against the 30-Jun deadline. Past supply record with Uniparts is satisfactory. Recommended.
Vendor B — Atlas Copco  L2
Meets technical specifications. Offers 18-month warranty vs 12 months from L1. However, total landed cost is ₹51,603 higher and delivery is 2 weeks longer. Not recommended on cost grounds.
Vendor C — Kaeser  L3
Quote not received despite two follow-ups on 05-Apr and 09-Apr-2026. Vendor did not respond. Marked as L3 / no quote.
Recommendation summary
Recommended: Vendor A — Elgi Equipments Ltd. (L1)
Lowest total landed cost ₹6,80,001 · Savings vs L2: ₹51,603 · Meets all technical specs.
No deviation from L1 recommendation.
CS Approval Sign-off
HOD sign-off
Pending — Rajesh Kumar
Finance Manager sign-off
Pending — Priya Mehta
PO Generation & Preview
Pending Finance Manager final approval — Priya Mehta. PO will be emailed to vendor upon approval.
Uniparts India Limited
A-18, Sector 60, Noida – 201301, Uttar Pradesh
GSTIN: 09AAICU1234F1Z8  ·  Tel: 0120-4028XXX  ·  [email protected]
PURCHASE ORDER
No.: CGPO/25-26/0042
Date: 16-Apr-2026
Ref PR: CGPR/25-26/0036
To vendor
Elgi Equipments Ltd.
132, Industrial Estate, Coimbatore – 641009, Tamil Nadu
GSTIN: 33AABCE5678G1Z2
Contact: Mr. Suresh T. · [email protected]
Commercial terms
Payment: 30% advance; balance on delivery
Delivery: 6–8 weeks from PO date
Vendor quote: EE/Q/2025/1143 dt. 05-Apr-2026

#DescriptionQtyUOMRate (₹)Amount (₹)
1
CNC turning centre (4-axis)
Model: BFW LX-40 · Swing: 500mm, Between centres: 1000mm, 12-station BMT55 turret · Warranty: 12 months on-site
1No. 28,00,00028,00,000
2
Coolant recirculation unit
OEM spec compatible with BFW LX-40 · 80L capacity · Supplied with machine
1Set 50,00050,000
Taxable amount₹5,76,272
CGST @ 9%₹51,864
SGST @ 9%₹51,864
Freight & packing₹0
Total PO Value₹6,80,000
Terms & Conditions: 1. Delivery strictly as per schedule; delay penalty @1%/week. 2. Pre-dispatch QC inspection mandatory — notify 7 days prior. 3. Invoice in triplicate with test certificates. 4. Disputes subject to Pune jurisdiction.
Authorised Signatory — Finance Manager
Authorised Signatory — Purchase Officer
My Requisitions
3
Open
1
Returned — needs revision
4
Completed this FY
🔍
📄
Filter by:
PR No.ItemEst. Cost (₹)StagePipeline progressRaised
CGPR/25-26/0041
CNC turning centre
Production · CC-PROD-01
28,50,000Finance review
PRHODFinPHMDRFQCSPO
14-Apr-26
CGPR/25-26/0029
Laptops – engineering (4)
IT · CC-IT-02
2,40,000Returned by HOD
PRHODFinRFQCSPO
08-Apr-26
CGPR/25-26/0021
Forklift 3-ton electric
Stores · CC-STR-01
14,20,000MD approval
PRHODFinPHMDRFQCSPO
01-Apr-26
CGPR/25-26/0015
Welding station 6-torch
Production · CC-PROD-01
1,20,000PO issued
PRHODFinRFQCSPO
22-Mar-26
Admin Panel
Workflow
Masters
Platform settings
Approval matrix — amount thresholds
LevelApprover roleMin. amount (₹)Max. amount (₹)Sequence
1HOD1
2Finance Manager2
3Plant Head3
4MD / Director4
SLA thresholds (working days before escalation alert)
User — role assignments
NameEmailDepartmentAssigned rolesStatus
Rajesh Kumar[email protected]ProductionHODRequestorActive
Priya Mehta[email protected]FinanceFinance Mgr.Active
V.K. Sharma[email protected]ManagementPlant HeadActive
R.S. Agarwal[email protected]ManagementMD / DirectorActive
Anil Joshi[email protected]PurchasePurchase OfficerActive
PR number format
Preview: CGPR/25-26/0001
PO number format
Preview: CGPO/25-26/0001
Email templates
Variables: {{pr_number}} · {{item_name}} · {{estimated_cost}} · {{requestor_name}} · {{department}} · {{approver_name}} · {{action_link}} · {{po_number}} · {{vendor_name}}
Plants & locations
Plant codePlant / location nameCityStateAddressStatus
PLT-01Plant 1 — NoidaNoidaUttar PradeshA-18, Sector 60, Noida – 201301Active
PLT-02Plant 2 — RaiSonipatHaryanaPlot 14, IMT Rai, Sonipat – 131029Active
PLT-03Warehouse — LudhianaLudhianaPunjabG.T. Road, Focal Point, LudhianaInactive
Departments
Dept. codeDepartment namePlantHODCost centre prefixStatus
PRODProductionPLT-01, PLT-02Rajesh KumarCC-PRODActive
MAINTMaintenancePLT-01, PLT-02K.P. SinghCC-MAINTActive
QCQuality ControlPLT-01S. GuptaCC-QCActive
ITInformation TechnologyPLT-01A. DesaiCC-ITActive
STOREStores & LogisticsPLT-01, PLT-02M. YadavCC-STRActive
FINFinance & AccountsPLT-01Priya MehtaCC-FINActive
Cost centres
CodeCost centre nameDepartmentPlantBudget headStatus
CC-PROD-01Production – Line AProductionPLT-01Capital ExpenditureActive
CC-PROD-02Production – Line BProductionPLT-01Capital ExpenditureActive
CC-MAINT-01Maintenance – PLT-01MaintenancePLT-01Capital ExpenditureActive
CC-IT-01IT InfrastructureITPLT-01IT CapitalActive
CC-STR-01Stores – PLT-01StoresPLT-01Capital ExpenditureActive
CC-PROD-03Production – PLT-02ProductionPLT-02Capital ExpenditureInactive
Item categories
CodeCategory nameDescriptionAsset typeDepreciation %Min. quotes reqd.Status
MACHMachinery & equipmentProduction machinery, CNC, pressesPlant & machinery15%3Active
ITIT hardwareComputers, servers, networkingIT assets30%3Active
VEHVehiclesForklifts, trucks, company vehiclesMotor vehicles15%3Active
FURNFurniture & fixturesOffice furniture, shop floor fixturesFurniture10%2Active
TOOLTools & jigsPrecision tools, jigs, dies, fixturesTools & equipment20%2Active
ELECElectrical & instrumentationControl panels, instruments, wiringPlant & machinery15%3Active
OTHROtherMiscellaneous capital itemsOther fixed assets10%3Active
Units of measure (UOM)
CodeDescriptionTypeUsed in categoriesStatus
NOSNumbersCountMachinery, IT, VehiclesActive
SETSetCountTools, FurnitureActive
LOTLotCountAll categoriesActive
KGKilogramWeightOtherActive
MTRMetreLengthElectrical, OtherActive
LTRLitreVolumeOtherActive
SQFTSquare feetAreaFurniture, OtherActive
Budget heads
CodeBudget head nameTypeAnnual budget (₹)Utilised (₹)Available (₹)Status
BH-CAPEX-01Plant & machinery capexCapex 2,00,00,000 68,50,000 1,31,50,000 Active
BH-IT-01IT capital expenditureCapex 25,00,000 12,40,000 12,60,000 Active
BH-VEH-01Vehicle & fleet capexCapex 30,00,000 14,20,000 15,80,000 Active
BH-FURN-01Furniture & fixturesCapex 5,00,000 4,80,000 20,000 Active
FY 2025-26  ·  Budget figures are indicative. Finance Manager can override during PR approval.
Vendor master (read-only lookup in v1)
CodeVendor nameCityGSTINCategoryContactRatingStatus
VND-001BFW LimitedBengaluru29AAACB1234G1Z5Machinery[email protected]★★★★☆Approved
VND-002Elgi Equipments Ltd.Coimbatore33AABCE5678G1Z2Machinery[email protected]★★★★★Approved
VND-003Atlas Copco India Pvt. Ltd.Pune27AAACA9012H1Z8Machinery[email protected]★★★★☆Approved
VND-004Lenovo India Pvt. Ltd.Bengaluru29AAACL3456I1Z4IT hardware[email protected]★★★★☆Approved
VND-005Kaeser Compressors IndiaGurgaon06AAACK7890J1Z1Machinery[email protected]★★★☆☆Under review
Priority levels
CodePriority nameDescriptionHOD SLA (days)Finance SLA (days)Colour tagStatus
CRITCritical Production stoppage risk; approve within 24 hrs 1 1 Critical Active
URGUrgent Operational impact; approve within 3 days 3 2 Urgent Active
NORMNormal Planned purchase; standard SLA applies 5 3 Normal Active
PLANPlanned (budget) Approved in annual budget; no urgency 7 5 Planned Active
SLA overrides the default approval matrix thresholds when a PR has Critical or Urgent priority.
Auto-approval rules (time-based)
Important: Auto-approval advances a PR if no action is taken within the configured timeout. It does not override a mandatory decision — it acts as an escalation bypass only when explicitly enabled per level.
Approval levelAuto-approve after (days)Applies whenEnabled
HODPriority = Normal only
Finance ManagerPriority = Normal only
Plant HeadPriority = Normal only
MD / DirectorPriority = Normal only
How it works: If an approver has not acted within the configured number of working days, the system auto-advances the PR to the next approval level and logs an "Auto-approved (timeout)" entry in the audit trail. The approver and their manager receive an escalation email. Auto-approval is never triggered for Urgent or Critical priority PRs.
Notification settings
EventRecipient(s)ChannelEnabled
PR submittedFirst approver (HOD)Email
PR approved at levelNext approver in chainEmail
PR returnedRequestorEmail
PR rejectedRequestor + HODEmail
SLA approaching (80%)Approver + their managerEmail
SLA breachedApprover + their manager + System AdminEmail
Auto-approval triggeredSkipped approver + their managerEmail
RFQ ready for quotesPurchase OfficerEmail
CS approval requiredHOD + Finance ManagerEmail
PO dispatched to vendorVendor + Requestor + Purchase OfficerEmail
@mention / notifyNamed person (from Discussion zone)Email
System configuration
Classification defaults
Budget availability is not checked by this module. The Finance Manager independently validates budget during approval. This system records Capex/Opex classification and committed amounts for reference only — it does not enforce budget limits.
Minimum quotation rules
Scope boundaries — features explicitly NOT covered by this module
✕ Goods receipt & delivery confirmation
No inward goods receipt process, no delivery confirmation, no partial delivery tracking, and no QC inspection on receipt. Module has no visibility into whether ordered goods have arrived.
✕ Invoice processing & payment
No vendor invoice capture, no three-way matching (PO vs GRN vs invoice), no payment scheduling, and no accounts payable integration. Module lifecycle closes at PO dispatch.
✕ Budget control layer
No budget availability check before approval, no real-time consumption tracking, no block when budget is exhausted. Finance Manager validates budget manually. This module records Capex/Opex classification and committed amounts for reference only.
✕ Vendor master integration / vendor management
The vendor master is a local lookup table (read-only in v1). No external vendor portal, no vendor onboarding workflow, and no vendor performance management system.
✕ Asset lifecycle linkage
No asset tagging, no depreciation tracking, and no integration with a fixed asset register or ERP asset module. Module lifecycle closes at PO dispatch.
PR Status Report Capital goods purchase requisitions — FY 2025-26
Total PRs
38
FY 2025-26
Pending approval
9
4 beyond SLA
In procurement
7
RFQ / CS stage
PO issued
18
₹4.2 Cr total
Rejected
4
₹48L not spent
Filters:
🔍
PR No.Item descriptionDeptPlantCategoryEst. cost (₹)RequestorSubmittedStageDaysStatusPO No.
CGPR/25-26/0043Press brake 80-tonProductionPLT-01Machinery4,80,000M. Patil15-Apr-26HOD review1Pending
CGPR/25-26/0041CNC turning centre (4-axis)ProductionPLT-01Machinery28,50,000S. Patil14-Apr-26Finance review2Pending
CGPR/25-26/0038Air compressor 50 HPMaintenancePLT-01Machinery6,80,000R. Joshi09-Apr-26RFQ stage7In progress
CGPR/25-26/0035Welding station (6-torch)ProductionPLT-02Machinery1,20,000P. Kamble02-Apr-26PO issued14CompleteCGPO/25-26/0031
CGPR/25-26/0029Laptops – engineering (4 nos.)ITPLT-01IT hardware2,40,000A. Desai08-Apr-26Returned8Returned
CGPR/25-26/0021Forklift 3-ton electricStoresPLT-01Vehicles14,20,000M. Yadav01-Apr-26MD approval15Pending
CGPR/25-26/0018EOT crane 5-tonProductionPLT-02Machinery22,00,000K. Singh28-Mar-26PO issued19CompleteCGPO/25-26/0024
CGPR/25-26/0012Server rack & UPSITPLT-01IT hardware8,50,000A. Desai20-Mar-26Rejected26Rejected
Showing 8 of 38 records  ·  Load more
Approval Turnaround Report Average days per approver — FY 2025-26
Avg. total cycle time
8.4d
PR submit → PO issue
On-time approvals
74%
Within SLA
SLA breaches
9
This FY
Avg. HOD response
3.2d
SLA target: 5d
Average response time by approver (days · SLA shown as dotted line)
Rajesh Kumar — HOD
avg. 3.2dWithin SLA
0dSLA: 5d10d
Priya Mehta — Finance Manager
avg. 2.8dWithin SLA
0dSLA: 5d10d
V.K. Sharma — Plant Head
avg. 5.9dMarginal
0dSLA: 5d10d
R.S. Agarwal — MD / Director
avg. 7.1dSLA breached
0dSLA: 5d10d
PR No.ItemHOD (d)Finance (d)Plant Head (d)MD (d)Total approval (d)SLA status
CGPR/25-26/0035Welding station213On time
CGPR/25-26/0029Laptops (4 nos.)66HOD overdue
CGPR/25-26/0021Forklift 3-ton325818MD overdue
CGPR/25-26/0018EOT crane 5-ton434617MD marginal
Budget Utilisation Report Capex budget vs actual commitment — FY 2025-26
Total capex budget
₹2.6Cr
FY 2025-26
Committed (PO issued)
₹1.05Cr
40% of budget
In pipeline
₹78.5L
PRs approved, PO pending
Available
₹76.5L
Uncommitted balance
Budget utilisation by budget head
Plant & machinery capex — BH-CAPEX-01 ₹68.5L committed of ₹2,00,00,000
Committed: ₹68.5L (34%) In pipeline: ₹28.5L (14%) Available: ₹1,03L (52%)
IT capital expenditure — BH-IT-01 ₹12.4L committed of ₹25,00,000
Committed: ₹12.4L (50%) Available: ₹12.6L (50%)
Vehicle & fleet capex — BH-VEH-01 ₹14.2L committed of ₹30,00,000
Committed: ₹14.2L (47%) In pipeline: ₹0 (0%) Available: ₹15.8L (53%)
Furniture & fixtures — BH-FURN-01 ₹4.8L committed of ₹5,00,000 — 96% used
⚠ Near budget limit — only ₹20,000 available. Finance Manager approval required before any new PR against this head.
DepartmentPlantNo. of PRsTotal est. (₹)POs issued (₹)In pipeline (₹)Rejected (₹)Budget head
ProductionPLT-01, PLT-02161,24,50,00072,00,00028,50,00024,00,000BH-CAPEX-01
MaintenancePLT-01718,60,00012,00,0006,80,000BH-CAPEX-01
StoresPLT-01424,20,00014,20,00010,00,000BH-VEH-01
ITPLT-01514,90,0006,40,0008,50,000BH-IT-01
Procurement Analytics PO register & vendor analysis — FY 2025-26
Total PO value
₹4.2Cr
18 POs issued
Avg. PO value
₹23.3L
Per PO
L1 acceptance rate
82%
6 deviations recorded
Avg. procurement time
12.4d
Approval → PO dispatch
PO value by item category
Machinery & equipment₹3,12,00,000  (74%)
Vehicles₹62,00,000  (15%)
IT hardware₹18,40,000  (4%)
Tools & jigs₹24,80,000  (6%)
Other₹4,80,000  (1%)
Top vendors by PO value
BFW Limited
3 POs · Machinery
₹84L
L1 both times
Elgi Equipments Ltd.
2 POs · Machinery
₹13.6L
L1 both times
Lenovo India Pvt. Ltd.
2 POs · IT hardware
₹12.4L
L1 both times
Atlas Copco India
1 PO · L2 deviation
₹7.3L
Deviation justified
PO register
PO No.PR No.ItemVendorCategoryPO value (₹)L1?PO dateDelivery dueStatus
CGPO/25-26/0042CGPR/25-26/0036Air compressor 50 HPElgi EquipmentsMachinery6,80,000Yes16-Apr-2602-Jun-26Awaiting delivery
CGPO/25-26/0031CGPR/25-26/0035Welding station (6-torch)Ador Welding Ltd.Machinery1,20,000Yes02-Apr-2630-Apr-26Delivered
CGPO/25-26/0024CGPR/25-26/0018EOT crane 5-tonIndef Cranes Pvt. Ltd.Machinery22,00,000Yes16-Mar-2616-May-26Awaiting delivery
CGPO/25-26/0019CGPR/25-26/0015Server rack & UPSAtlas Copco IndiaIT hardware7,31,604No (L2)10-Mar-2624-Apr-26Delivered